Sova Tandem Pod — Pair
Tax included where applicable. Delivery and commissioning arranged by your concierge.
XAVORNEX Focus — deep work, docked
Pairs work differently on different days; the Sova keeps up — spine up for parallel deep work, spine folded for pair-programming afternoons, acoustics measured either way.
A pod is a building pretending to be furniture, so we build it like one: laminated acoustic glass, walls layered from recycled PET felt over engineered board, doors with double perimeter gaskets, and floors decoupled on elastomer springs so heels and hums stay outside. Speech level reduction is measured to ISO 23351-1 per series and printed on the unit's test card — the number is the product.
Design & Craft
- Felt interior drinks keyboard clatter and thought aloud
- Two years parts and labour; parts stocked fifteen
- Two people, two calls, no negotiation
- Speech level reduction measured to ISO 23351-1 per series
- Ventilation in m³/h stated; fan below notice at ear height
- Tandem desks with an acoustic spine between
Specifications
| Format | Tandem, folding spine |
| Speech reduction | ≈ 30 dB(A), ISO 23351-1 |
| Desks | 2 × 650 mm depth |
| Ventilation | 120 m³/h, dual path |
| Power | Per-desk sockets + USB-C |
| Weight | ≈ 728 kg |
| Warranty | 2 years, parts stocked 15 |
Care
Keep door gaskets clean and hinges dry-lubed yearly; spills lift from PET felt with mild soap and patience. Fans, filters, gaskets and glass are stocked parts — pods are repaired by component, never by apology.
Questions, Answered
Can it relocate when the office moves?
Yes — flat-pack engineering means our crew relocates a booth in hours and re-verifies the acoustics after reassembly. Moving is a service, not a demolition.
Does it need a permit or fixed installation?
No — pods are furniture: they stand on the floor, plug into a socket, and move when you do. Our crews level and commission; nothing is bolted to the building.
The XAVORNEX Promise
Offices move; pods should keep up. Flat-pack engineering plus our own crews mean a relocation takes hours — with acoustics re-verified after every move.