XAVORNEX

Sotto Wall Panel Set — Floor

33.500,00 Kč

Tax included where applicable. Delivery and commissioning arranged by your concierge.

measured, not promisedISO 23351-1 test card ships with the pod.
commissioned by our crewLevelled, assembled, air-balanced — packaging gone.
serviced for fifteen yearsFans, gaskets and covers stocked; relocations in hours.

XAVORNEX Panels — rooms, taught to listen

The Sotto set teaches a wall to listen: measured PET felt in formats that tile without visible grids, densities chosen for absorption curves, and enough square metres to treat the reflections a room actually uses.

Good acoustic treatment is invisible arithmetic: so many square metres of class A absorption at the reflection points a room actually uses. Our panels make the arithmetic honest — measured products, printed data, and a free room-plan service that turns your floor plan and photos into a hanging plan with quantities.

Design & Craft

  • Rental-friendly rail and magnet mounting options
  • Two years parts and labour; trims and fixings stocked fifteen
  • Free room-plan service: send a floor plan, receive a hanging plan
  • Class A options where speech privacy is the brief
  • Fixings in the box: glue, pin, rail or magnet per listing
  • Recycled PET or wool felt, colour through the material

Specifications

Set 32 panels ≈ 24 m²
Class A (αw 0.90)
Material Recycled PET felt
Mounting Glue / pin / rail / magnet
Plan Free hanging-plan service
Weight ≈ 84.0 kg
Warranty 2 years, parts stocked 15

Care

Rotate art panels out of harsh direct sun, keep rail hooks seated, and vacuum baffles at ladder-cleaning intervals. Panels forgive offices; offices should return the favour with a soft brush.

Questions, Answered

How do they mount?
Glue, pin, rail or magnet — stated per product, hardware in the box. Rented walls love the rail and magnet options; deposits survive.

How many panels does my room need?
Send the floor plan and a phone photo; we return a hanging plan with quantities, positions and the measured numbers behind them — free, and honest about diminishing returns.

The XAVORNEX Promise

Offices move; pods should keep up. Flat-pack engineering plus our own crews mean a relocation takes hours — with acoustics re-verified after every move.