Sepot Tandem Pod — Pair
Tax included where applicable. Delivery and commissioning arranged by your concierge.
XAVORNEX Focus — deep work, docked
The Sepot seats two focuses without a treaty: tandem desks divided by an acoustic spine, separate air paths under shared ventilation, and room for two calls at once with no negotiation.
A pod is a building pretending to be furniture, so we build it like one: laminated acoustic glass, walls layered from recycled PET felt over engineered board, doors with double perimeter gaskets, and floors decoupled on elastomer springs so heels and hums stay outside. Speech level reduction is measured to ISO 23351-1 per series and printed on the unit's test card — the number is the product.
Design & Craft
- Pair-programming mode: spine folds, desks meet
- Shared ventilation, separate air paths
- Two people, two calls, no negotiation
- Desk, light and air tuned for ninety-minute stretches
- Felt interior drinks keyboard clatter and thought aloud
- Tandem desks with an acoustic spine between
Specifications
| Format | Tandem, folding spine |
| Speech reduction | ≈ 30 dB(A), ISO 23351-1 |
| Desks | 2 × 650 mm depth |
| Ventilation | 120 m³/h, dual path |
| Power | Per-desk sockets + USB-C |
| Weight | ≈ 752 kg |
| Warranty | 2 years, parts stocked 15 |
Care
Vacuum felt walls monthly with a soft brush; wipe glass with standard cleaner and gaskets with a damp cloth. Swap ventilation filters on the printed schedule — two minutes, no tools. Book the yearly service and the acoustics stay certified.
Questions, Answered
Is the ventilation really silent?
Airflow is stated in m³/h per person and the fan's sound level at seated ear height is printed in the specification. You hear your call, not the pod.
Does it need a permit or fixed installation?
No — pods are furniture: they stand on the floor, plug into a socket, and move when you do. Our crews level and commission; nothing is bolted to the building.
The XAVORNEX Promise
Offices move; pods should keep up. Flat-pack engineering plus our own crews mean a relocation takes hours — with acoustics re-verified after every move.