Sednice Quad Pod
Tax included where applicable. Delivery and commissioning arranged by your concierge.
XAVORNEX Pods — meetings, with the volume down
Most meetings are four people pretending to need a boardroom; the Sednice right-sizes them — elbow-honest table, CO₂-scaled air for the ninety-minute version, and walls that treat decisions as confidential by default.
Silence is engineering, not upholstery. Our booths move air quietly — measured cubic metres per hour per person with fans you cannot hear at conversation distance — light faces at a flattering 4000 K without flicker, and every panel, gasket and fan is a stocked part for fifteen years. The comfort is the acoustics holding at minute ninety of a difficult call.
Design & Craft
- Speech level reduction measured to ISO 23351-1 per series
- Table, power and screen mounts arrive pre-wired
- Four seats with elbow honesty, not brochure optimism
- 55-inch media wall option pre-wired
- Acoustic glass on two sides keeps daylight in the meeting
- Floors decoupled; neighbours hear furniture, not decisions
Specifications
| Format | Four-seat pod |
| Speech reduction | ≈ 31 dB(A), ISO 23351-1 |
| Ventilation | 220 m³/h, CO₂-scaled |
| Booking | Panel option, corridor-glow |
| Power | Table spine + USB-C |
| Weight | ≈ 858 kg |
| Warranty | 2 years, parts stocked 15 |
Care
Vacuum felt walls monthly with a soft brush; wipe glass with standard cleaner and gaskets with a damp cloth. Swap ventilation filters on the printed schedule — two minutes, no tools. Book the yearly service and the acoustics stay certified.
Questions, Answered
Is the ventilation really silent?
Airflow is stated in m³/h per person and the fan's sound level at seated ear height is printed in the specification. You hear your call, not the pod.
Does it need a permit or fixed installation?
No — pods are furniture: they stand on the floor, plug into a socket, and move when you do. Our crews level and commission; nothing is bolted to the building.
The XAVORNEX Promise
Pods are commissioned, not couriered. Our crews level, assemble, connect and air-balance every unit, test the acoustics on site, and take the packaging away.