XAVORNEX

Rifugio Modular Room — Ten

475.500,00 Kč

Tax included where applicable. Delivery and commissioning arranged by your concierge.

measured, not promisedISO 23351-1 test card ships with the pod.
commissioned by our crewLevelled, assembled, air-balanced — packaging gone.
serviced for fifteen yearsFans, gaskets and covers stocked; relocations in hours.

XAVORNEX Rooms — architecture, indoors

When the lease says no walls, the Rifugio says no problem — fire-classified materials with certificates in the pack, ventilation sized per seat, and a boardroom that unbolts and follows the company home.

Modular rooms are architecture that arrives on a pallet: structural frames engineered for their spans, acoustic sandwich walls with measured reduction, ventilation sized in cubic metres per hour per seat, and lighting, power and data arriving where the drawings say. Our crews assemble in hours, air-balance, and hand over a room that behaves like it was always there.

Design & Craft

  • Six to ten seats with boardroom manners
  • Lighting, power and data arrive where drawings say
  • Glass walls option keeps daylight in the plan
  • Ventilation sized in m³/h per seat, CO₂-scaled
  • Structural frames engineered for their spans
  • Interior acoustics tuned for conversation, not echo

Specifications

Format 10-seat room + lobby
Walls Acoustic sandwich, measured
Ventilation m³/h per seat, CO₂-scaled
Fire Classified, certificates packed
Install Our crews, days
Weight ≈ 2485 kg
Warranty 2 years, parts stocked 15

Care

Keep thresholds clear, glass wiped, and vents unblocked by well-meaning plants. After any relocation our crews re-commission and re-certify — rooms move well when professionals move them.

Questions, Answered

How long does installation take?
Hours to low single-digit days by size — stated per listing. Our crews assemble, air-balance, test acoustics and hand over the same week the pallets arrive.

Is planning permission needed?
Modular rooms are furniture-class structures standing free of the building; most CZ sites need only landlord notification. The documentation pack covers fire classification and materials for facilities and insurers.

The XAVORNEX Promise

One standard across the range: if it would not survive our own co-working floors in Prague, it does not ship with the XAVORNEX mark.