Oaza Wellness Room — Rest
Tax included where applicable. Delivery and commissioning arranged by your concierge.
XAVORNEX Rooms — architecture, indoors
The Oaza gives the office its humane room: rest, nursing and prayer designed with dignity rather than improvised with a spare chair — lockable, bookable, silently ventilated and softly lit.
Modular rooms are architecture that arrives on a pallet: structural frames engineered for their spans, acoustic sandwich walls with measured reduction, ventilation sized in cubic metres per hour per seat, and lighting, power and data arriving where the drawings say. Our crews assemble in hours, air-balance, and hand over a room that behaves like it was always there.
Design & Craft
- Soft lighting scenes and genuinely silent air
- Rest, nursing and prayer rooms with dignity designed in
- Fire-classified materials, certificates in the pack
- Lockable, bookable, and screened for privacy
- Unbolts and relocates when the office does
- Assembled and air-balanced by our crews in days
Specifications
| Format | Rest: daybed + dimming |
| Privacy | Lockable, screened, bookable |
| Air | Silent, CO₂-scaled |
| Lighting | Scenes: calm to clinical |
| Weight | ≈ 1558 kg |
| Warranty | 2 years, parts stocked 15 |
Care
Treat the room like a room: vacuum walls seasonally, check door seals and closers quarterly, and change ventilation filters on the printed schedule. The yearly service re-balances air and re-verifies acoustics — book it with one email.
Questions, Answered
How long does installation take?
Hours to low single-digit days by size — stated per listing. Our crews assemble, air-balance, test acoustics and hand over the same week the pallets arrive.
Is planning permission needed?
Modular rooms are furniture-class structures standing free of the building; most CZ sites need only landlord notification. The documentation pack covers fire classification and materials for facilities and insurers.
The XAVORNEX Promise
Pods are commissioned, not couriered. Our crews level, assemble, connect and air-balance every unit, test the acoustics on site, and take the packaging away.