XAVORNEX

Luh Desk Screen Set — Bench Six

35.000,00 Kč

Tax included where applicable. Delivery and commissioning arranged by your concierge.

measured, not promisedISO 23351-1 test card ships with the pod.
commissioned by our crewLevelled, assembled, air-balanced — packaging gone.
serviced for fifteen yearsFans, gaskets and covers stocked; relocations in hours.

XAVORNEX Furniture — softness with a spine

The Luh set civilises the bench: desk-edge screens with measured near-field absorption, clamps that respect the desktop, and heights chosen so seated speech shadows seated ears.

We build seating the way studios build vocal booths — geometry first: wing depths and back heights chosen from measurement, cushions that seat springs quietly, and feet that never squeal on stone. Contract-grade everything, because soft should not mean short-lived.

Design & Craft

  • Acoustic geometry first: wings, backs and hoods from measurement
  • Two years parts and labour
  • Heights chosen for seated speech shadows
  • Clamps fit standard desktops without drilling
  • Upholstery panels replaceable; covers stocked fifteen years

Specifications

Set Screens for 6 desks
Absorption Near-field, measured
Clamps Tool-kind, drill-free
Rails Trays + hooks compatible
Weight ≈ 39.0 kg
Warranty 2 years, parts stocked 15

Care

Brush felt shells with a clothes brush, treat wool with wool's manners, and keep solvents away. Frames want nothing but honesty about loads. Every cover, cushion and glide is a stocked part for fifteen years.

Questions, Answered

How heavy are the pieces to move?
Weights are listed and glides are floor-kind; high-backs move on two people and ten metres of patience. Castor options exist where rearranging is weekly sport.

Does furniture really change room acoustics?
High backs and felt shells absorb and shadow speech at the point it starts, dropping the room's babble floor. It complements panels; it does not replace them — we will say which your room needs first.

The XAVORNEX Promise

Offices move; pods should keep up. Flat-pack engineering plus our own crews mean a relocation takes hours — with acoustics re-verified after every move.