Lind Quad Pod — Whiteboard
Tax included where applicable. Delivery and commissioning arranged by your concierge.
XAVORNEX Pods — meetings, with the volume down
The Lind is the meeting room the floor plan forgot, delivered on a pallet: four real seats, pre-wired screen mount, booking glow visible down the corridor, and acoustics that let the next desk keep thinking.
Silence is engineering, not upholstery. Our booths move air quietly — measured cubic metres per hour per person with fans you cannot hear at conversation distance — light faces at a flattering 4000 K without flicker, and every panel, gasket and fan is a stocked part for fifteen years. The comfort is the acoustics holding at minute ninety of a difficult call.
Design & Craft
- Whiteboard wall that erases like it promised
- Two years parts and labour; parts stocked fifteen
- Ventilation sized in m³/h per seat, CO₂-scaled on equipped models
- Speech level reduction measured to ISO 23351-1 per series
- Acoustic glass on two sides keeps daylight in the meeting
- Table, power and screen mounts arrive pre-wired
Specifications
| Format | Four-seat + whiteboard wall |
| Speech reduction | ≈ 31 dB(A), ISO 23351-1 |
| Ventilation | 220 m³/h, CO₂-scaled |
| Booking | Panel option, corridor-glow |
| Power | Table spine + USB-C |
| Weight | ≈ 853 kg |
| Warranty | 2 years, parts stocked 15 |
Care
Keep door gaskets clean and hinges dry-lubed yearly; spills lift from PET felt with mild soap and patience. Fans, filters, gaskets and glass are stocked parts — pods are repaired by component, never by apology.
Questions, Answered
What about power and data inside?
Sockets, USB-C and optional data pass-throughs are built in; consumption is a laptop's worth. The specification lists every port.
Does it need a permit or fixed installation?
No — pods are furniture: they stand on the floor, plug into a socket, and move when you do. Our crews level and commission; nothing is bolted to the building.
The XAVORNEX Promise
Pods are commissioned, not couriered. Our crews level, assemble, connect and air-balance every unit, test the acoustics on site, and take the packaging away.