Ceder Modular Room — Ten
Tax included where applicable. Delivery and commissioning arranged by your concierge.
XAVORNEX Rooms — architecture, indoors
The Ceder is architecture that arrives on pallets: an eight-to-ten-seat room with engineered spans, measured sandwich walls, and services landing exactly where the drawings promised — assembled by our crews in days.
The difference between a big pod and a small building is paperwork and physics; we respect both. Fire-classified materials with certificates in the pack, floors that take rolling loads, doors that close softly and seal fully — and when the office moves, the room unbolts and moves with it.
Design & Craft
- Glass walls option keeps daylight in the plan
- Ventilation sized in m³/h per seat, CO₂-scaled
- Interior acoustics tuned for conversation, not echo
- Assembled and air-balanced by our crews in days
- Acoustic sandwich walls with measured reduction
- Structural frames engineered for their spans
Specifications
| Format | 10-seat room + lobby |
| Walls | Acoustic sandwich, measured |
| Ventilation | m³/h per seat, CO₂-scaled |
| Fire | Classified, certificates packed |
| Install | Our crews, days |
| Weight | ≈ 1993 kg |
| Warranty | 2 years, parts stocked 15 |
Care
Treat the room like a room: vacuum walls seasonally, check door seals and closers quarterly, and change ventilation filters on the printed schedule. The yearly service re-balances air and re-verifies acoustics — book it with one email.
Questions, Answered
Is planning permission needed?
Modular rooms are furniture-class structures standing free of the building; most CZ sites need only landlord notification. The documentation pack covers fire classification and materials for facilities and insurers.
What about fire and ventilation compliance?
Materials carry their fire classifications with certificates in the pack; ventilation is sized in m³/h per seat and stated. Your safety officer gets a folder, not a shrug.
The XAVORNEX Promise
Pods are commissioned, not couriered. Our crews level, assemble, connect and air-balance every unit, test the acoustics on site, and take the packaging away.